Projects

Marine Geotechnical Investigation, Kingstown, St. Vincent.

Subsurface Pro Project Expansion Project St. Vincent
Offshore Subsurface Investigation for Proposed Port Expansion, St. Vincent.

Eight marine boreholes were advanced to a depth of approx. 30 to 45 meters below mudline (sea floor bed). These test boreholes were drilled from a jack up barge, and  two additional marine boreholes, advanced to a depth of 6 to  12 meters below mudline to investigate a sewer outflow line. These borings were advanced using mud rotary drilling equipment through the overburden soils in water on average depth of 15m (50 ft.) and total depth of 33-64m (110 to 210 ft. July – August 2022

SOL Caribbean Ltd.. – Phase II Environmental Site Assessments
SOL Caribbean Ltd.. – Phase II Environmental Site Assessments of Fuel Terminals.

Undertook a number of Phase I and II environmental site assessment studies for 13 fuel storage terminal sites across 4 Eastern Caribbean countries, including, Barbados, Grenada, Dominica, and St. Vincent & Grenadine islands, Bequia, Canouan, and Mustique. The project included supervision of drilling of boreholes and the installation of monitoring wells, and carried out associated soil and water testing, in association with WSP – Golder & Associates & KKS CONSULTING. April – October 2021

Barbados Water Authority Reservoir Tanks Ground Improvement Grouting Supervision
Geotechnical Investigation & Ground Improvement Grouting Supervision for (2) two X 250 K Gal Barbados Water Authority Reservoir Tanks (Ionics Freshwater)

Performed inspections, and a record of drilling of injection points, drill rates, material types, rock depth (as encountered), total casing penetration depth, and similar. Recorded measurements of grout quantities, injection rate, injection pressure, grout consistency, grout strength, and similar data.– July 2021

Claybury Plantation Wind Turbine Project Barbados
Preliminary Geotechnical Investigations – Ashford Plantation, and Claybury Plantation Wind Turbine Project, Barbados (Pavana Energy Ltd.)

Preliminary Geotechnical Investigations – Drilling No. Eight (8) Boreholes (BHs) to Approx. 40 ft. Depth (320 linear ft. per site) & No. Three Pressure meter (PMT) tests per site. Micro pile Anchor Installation, involving Angular Drilling of approx. 60 Boreholes for Tension Bar Installation for Wind Turbines, 15 Boreholes Per Turbine. March  – June 2021

Barbados Water Authority Bridgetown Sewage Plant
BWA – Bridgetown Sewage Plant, Preliminary Geotechnical Investigation - Proposed Expansion.

The Barbados Water Authority – Bridgetown Sewage Plant (BTSTP), Preliminary Geotechnical Investigation for Proposed Expansion Project. –  June 2020

Barbados Light & Power Lamberts St. Lucy Wind Turbine Site
Barbados Light & Power (BL&P) Geotechnical Investigation Lamberts St. Lucy Wind Turbine Site (Stantec Consulting)

Barbados Light & Power (BL&P) Geotechnical Investigation Lamberts St. Lucy Wind Turbine Site (Stantec Consulting) May 2020

Geotechnical Investigation of White Hill Road Failure
Scotland District Geotechnical Investigation

Geotechnical Investigation of the “Scientific Study of the Failure of the Road at White Hill” report by AEC, Scotland District March 2020

Subsurface Geotechnical Investigations for Tourism Development in Scotland District
Private Client Geotechnical Investigation

Subsurface Geotechnical Investigations for Tourism Development in Scotland District, New Castle, St. John, Barbados.  January 2020

Geotechnical Investigations of Barbados Water Authority
Barbados Water Authority Lodge Hill

Geotechnical Investigations of BWA Reservoirs at Lodge Hill, Trents, Warliegh, and Spring Garden (Ionics Freshwater) August 2017 – May 2019

SOL Deep Injection Dewatering and Abstraction Wells
SOL Barbados Ltd.

SOL Barbados Ltd. – Installation of a Deep Injection Dewatering and Abstraction Wells at SOL Terminal. Nov 2018 – Dec 2018

Government of Barbados – HMS Dodds Prison – Effluent Waste Water Effluent Sampling Programme.
Government of Barbados – HMS Dodds Prison – Effluent WasteWater Effluent Sampling Programme.

Government of Barbados – HMS Dodds Prison – Project management and supervision of ongoing monthly, and quarterly waste water sampling and laboratory testing and monitoring of waste water effluent, generated from the facility’s sewerage treatment plant and aeration ponds and settlement lagoons, since Apr 2011 – April 2018.

COMPLANT China National Complete Plant Import & Export Corp Ltd. – Wyndam Sam Lords Hotel Redevelopment Project – Geotechnical Investigations.
China National Complete Plant Import & Export Corp Ltd. – Wyndam Sam Lords Hotel Redevelopment Project.

Geotechnical investigation which required drilling over forty (40) borings drilled within the proposed building limits, to determine the in-situ strength of the site soil/rock and the condition of the underlying rock and possible existence of caves or fissures within the rock, determination of stratigraphy, detection of any cavities/sinkholes, and bearing capacity.  Jan 2017 – Mar 2018 

Water Technologies Systems Inc. – Barbados Water Authority: Desalination Monitoring & Test Well Project (South Coast of Barbados) Jun 2017 – Sep 2017
Everclear Water Inc. – Barbados Water Authority: Desalination Monitoring & Test Well Project (North Coast of Barbados)

Carrying out feasibility studies for a proposed sea water desalination plant on the north-west coast of the island and as such required some test wells and monitoring wells drilled within the site. This involved drilling and installation of deep abstraction/injection groundwater wells to specification, and pump testing.  Jun 2017 – Sep 2017

Water Technologies Systems Inc. – Barbados Water Authority: Desalination Monitoring & Test Well Project (South Coast of Barbados) Jun 2017 – Sep 2017
Geotechnical & Environmental Phase 2 Site Assessment Study SOL Caribbean Ltd. Mandela Avenue, Georgetown, Guyana - 2018

Supervision of a geotechnical engineering investigation conducted at the site to develop parameters for the design of facilities bearing on the ground surface at the site for a service station and retail development. The site was formerly used as a landfill, several groundwater monitoring wells are to be installed at the site to provide both soil and groundwater samples for analyses.

The geotechnical engineering and environmental site assessment services consisted of field and laboratory investigations and engineering analyses. 

Grenada Super Dorm 2016
Geotechnical Investigations – Super Dorm, St. Georges University, Grenada - 2016

Subsurface performed Standard penetration test (SPT) borings drilled with a direct push probe, and Geotech Report submitted to Civil Structural Engineers (.Stantec Consulting Caribbean Ltd.) This geotechnical investigation provided the design input for the construction of a five-story approx. 81,690 square foot dormitory the largest at the university.

Everclear Water Inc. – Barbados Water Authority: Desalination Monitoring & Test Well Project (North Coast of Barbados) Jun 2017 – Sep 2017
Water Technologies Systems Inc. – Barbados Water Authority: Desalination Monitoring & Test Well Project (South Coast of Bds)

Carrying out feasibility studies for a proposed sea water desalination plant in the south-east of the island, and as such required some test wells and monitoring wells drilled within the site. This involved drilling and installation of deep abstraction/injection groundwater wells to specification, and pump testing. Jun 2017 – Sep 2017

Jada Group – Worthing Service Station Deep Injection Dewatering Wells.
Jada Group – Worthing Service Station Deep Injection Dewatering Wells.

Worthing Service Station deep injection dewatering wells. Jun 2016 – Jul 2016

Golder Associates Inc. – Coastal Zone Management Program (CRMP) Geotech Slope Stability Study Scotland.
Golder Associates Inc. - Coastal Zone Management Program (CRMP) Geotech Slope Stability Study Scotland.

Coastal Zone management program. Jun 2015 – May 2016

CRMP Cliff Drilling & Geotech Testing Golder Associates Inc.
CRMP Cliff Drilling & Geotech Testing Golder Associates Inc.

Golder Associates Inc. – CRMP Cliff Drilling & Geotech testing. April 2016

Jada Group – Installation of 6 Monitoring Wells Service Station.
Jada Group – Installation of 6 Monitoring Wells Service Station.

Installation of 6 monitoring wells.. May 2015

Barbados Light & Power Generation Plant Effluent WasteWater Sampling Programme
Barbados Light & Power Generation Plant Effluent WasteWater Sampling Programme.

Project management and supervision of an ongoing Wastewater Sampling & Laboratory Testing & Monitoring Programme, on wastewater effluent from the generation plant cooling towers and site runoff. Jan 2011 – Sept 2013

Hillis -Carnes Engineering Associates Inc. – Barbados Cane Industry Corporation – Andrews Sugar Factory, St. Joseph, Barbados
Hillis - Carnes Engineering Associates Inc. Barbados Cane Industry Corporation – Andrews Sugar Factory.

Carrying Out STP Soil Borings & Testing. – Project management and supervision of the installation of approx. twenty seven (27) STP Soil Borings and testing to approx. 30-50 feet deep. Sept 2013 – Oct 2013

British American Insurance Building – Geotechnical Assessment– Carrying Out STP Soil Borings Testing & Cement Grouting.
Hillis -Carnes Engineering Associates Inc. – British American Insurance Building – Geotechnical Assessment– Carrying Out STP Soil Borings Testing & Cement Grouting.ection Dewatering Wells.

Hillis-Carnes Engineering Associates Inc. – British American Insurance Building: Project management and supervision of the installation of four (4) STP Soil Borings and testing to approx. 75 feet deep, and cement grouting of 12 boreholes. Nov 2011

Subsurface Pro Project management and supervision
Project management and supervision of a number of geotechnical boreholes were carried out, and monitoring wells installed to the specification of the project’s professional geologist.

A number of standard penetration test (SPT) borings up to 60 to 70 feet through the overlying alluvial sediments were drilled to determine the classification of these sediments, and an electrical resistivity imaging (ERI) performed over the site. Nov 2011

Rotherly Construction – Sandy Lane Property Installation & Testing of Closed Loop Geothermal Abstraction & Injection Wells/Geotechnical Boreholes.
Rotherly Construction – Sandy Lane Property Installation & Testing of Closed Loop Geothermal Abstraction & Injection Wells/ Geotechnical Boreholes.

Oversight of the installation of two (2) abstraction wells, and two (2) injection wells both 200-feet deep, including pump testing of water production and discharge capacity to required engineer’s standards (Stantec Consulting). Completion of a number of geotechnical test boreholes including split spoon STP sampling and NQ rock core samples, preparation of borehole logs, and carrying out percolation testing to relevant engineering standards. July 2011

Stantec Consulting – Barbados Light & Power Co. Ltd. Water Tank Base Boreholes at Generation Plant.
Stantec Consulting – Subsurface Project Management of the Barbados Light & Power Co. Ltd. Water Tank Base Boreholes at Generation Plant.

Water Tank Base Boreholes at Generation Plant. – Subsurface project management and supervision of drilling of two borehole to 40 feet deep by air rotary method, to be located under the footprint of a proposed water tank located at a generation plant. In addition, driller’s log of boreholes were completed indicating any anomalies during this process and down hole video recording of borehole substratum. May 2011